Contractors-Plan Reviews and Permits for Development, Construction, and Life Safety Systems

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 

PFA Fire Prevention and Community Risk Reduction (FPCRR) Division reviews development documents and building permit submittals for projects within its jurisdiction. This includes Fort Collins, Timnath, Bellvue, Laporte, Horsetooth Reservoir, and parts Red Stone Canyon (which includes unincorporated Larimer and Weld Counties).

If a project requires development review or building permit in any of these jurisdictions, PFA must be a part of the review process.

Website Image

Please check your address to verify that it is within PFA’s jurisdiction Map 

City of Fort Collins Development Review 970-221-6689

City of Fort Collins Building Services 970-416-2740

Town of Timnath Building Services 970-449-4639

Larimer County Planning Division 970-498-7679

Larimer County Building Division 970-498-7700

Weld County Planning and Development Division 970-400-6100

Fire Codes

For most proposed commercial and residential developments, new buildings and building additions, the first step is for the applicant to receive approval of planning documents, which include site development plans, plats and public improvement construction plans, and then approval of building permit construction drawings.

It is the responsibility of the applicant and his/her contractors to be familiar with the adopted codes that apply to their project. Please make sure if there is any confusion or uncertainty about the requirements for your project, you contact PFA to discuss your specific project requirements as early as possible to avoid project delays. 

Click here for the currently adopted code and local amendments.

Permit Fee Schedule

Permit fees are assessed in accordance with our adopted fee schedule. Click Here to access the currently adopted fee schedule

Understanding the Plan Review Process

Commercial projects and residential sprinklers (13D) within PFA’s jurisdiction require a plan review and a series of inspections as part of the building and occupancy permit process. These reviews and inspections ensure the safety of the finished building.

PFA works closely with contractors to make the plan review process as easy as possible. Our goal is to get your project approved quickly, and to catch problems early when they're easy to fix.

How to Apply for a Construction Permit

Below is a list of requirements and links that FPCRR Division reviews and issues, as well as some additional information useful for construction projects in our jurisdiction.  Please call (970) 416-2891 if you have questions or need additional information.

Construction-Contractor Guidebook

Minimum Contractor Qualifications Guidebook

Construction Permits

Construction Permits Application (Use resources below)       

Commercial Knox Boxes must be ordered through Knox Box Directly  

Please follow the recommended series specified on your permit and order directly from http://www.knoxbox.com/

You will need to choose "Poudre Fire Authority" as the Fire Department.  You will receive confirmation after ordering.   Turn-around time from ordering is approximately 5-7 business days.

Knox-Box® Placement Suggestions:

Main entrance

  • Place no higher than six (6) feet
  • Will not be hidden by vegetation
  • Visible from street (not on back side of column)

For unusual circumstances, call Fire Prevention and Community Risk Reduction (970) 416-2891.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer